Maps – General

Screen Shot 2018-07-18 at 11.43.42 PM  CHSRA Current Map

Screen Shot 2019-05-22 at 10.16.46 PMCHSRA Route Map overlayed onto Street Map – March 2016

 

 

Click to download full PDF map.  CHSRA Route Map (simple) – March 2016 versus 4/14/15

  CHSRA Official Zoomable Map – as of 4/14/15

 

CHSRA Zoomable Map – as of 4/14/15 CHSRA map overlaid onto a satellite map so you can see a bit better where the routes go. It is not perfectly accurate due to offsets between the two maps, but close enough to see within a block where the proposed routes go.

 

CHSRA Map – as of 4/14/15

 

HSR Burbank-Palmdale Project Section PROFILE This is a Profile (or is also referred to as a section/cut-away) of the elevation of the route from Palmdale to Burbank.

 

High Speed Rail Authority – Proposed Statewide Alignment Map

 

San Gabriel Mountains National Monument – Angeles and San Bernadino Mountains Zoomable Detailed Map – from the US Forest Service

 


Sun Valley Area – Maps from CHSRA 2016-2017

Detail tunnel construction showing routes that are fully bored, cut-and-cover, & above ground/at surface.

The first two images were prepared from maps dated February 23, 2017 obtained from CHSRA through a public records request and annotated by SAFE for clarity. The third and fourth images help give context and dimensions regarding the cut-and-cover process: Third image shows both E2’s path and depth profile; Fourth image illustrates the different footprints for various construction methods. Click images to enlarge. See links below to see more route “profile” information. The fifth & sixth images provide detail information of where the 3 routes are most specifically to the Valley.

The last two images represent documents that are testament to how infeasible tunneling through the Angeles National Forest truly is.

Stonehurst-Area-E2-cut-cover-2
SR14E1cutcover
Profile-Map-E2
HSR-Train-footprint
Click here for CHSRA's map that delineates between cut and over and deep bored tunnels.

Click image above for CHSRA’s larger map that delineates between cut and over and deep bored tunnels.

Click image above to see enlarged map with street names of locations of the 3 alternative routes.

Click image above to see enlarged map with street names of locations of the 3 alternative routes.


Profile and Depth Maps Issued from CHSRA, August, 2016
Fly-over Videos Issued September 16, 2016

These are the Profile and Depth Maps and also the Fly-over videos for the three proposed routes of the California High Speed Train. Click to see all of the current and past information on CHSRA website for Palmdale to Burbank.

Palmdale to Burbank Project Section Fact Sheet – Summer 2016
Palmdale to Burbank Project Section CWG Presentation – Summer 2016
Click on the video to start, to enlarge, you can then click on the YouTube Logo or the four-corner square to go full screen